A leading Industrial Equipment Manufacturer sought to overcome production capacity constraints and address work order scheduling challenges at shop floor to better manage their end-to-end supply chain process by leveraging AtomIQ.
Challenges
- Lack of ability to simulate and visualize production schedule for Assembly and Component Manufacturing
- Difficult to manage production schedule with respect to actual resource capacity (labor hours)
- Challenging and time-consuming processes to manage production capacity across multiple work centers
- Lack of ability to notify production managers for critical work center capacity based on scheduled load
- Manual process to import true labor hours from timecard system
Solution
- Email Alerts and Notifications based on Work Center load for critical dates and capacity issues
- Simulate and visualize load review calendar with multiple dashboards for Assembly and Component manufacturing
- Timecard integration with work center Labor Hours for true actual Gross Capacity
- Simulate Load Review Calendar with better user interface with real-time forward and backward scheduling
- All Process / functions are embedded within JD Edwards E1 Pages to enable seamless navigation and improved user interfaces








